sprint-planning

Plan a sprint — scope work, estimate capacity, set goals, and draft a sprint plan. Use when kicking off a new sprint, sizing a backlog against team availability (accounting for PTO and meetings), deciding what's P0 vs. stretch, or handling carryover from the last sprint.

22,126stars2,591forksUpdated 6/29/2026

Security Assessment

Safe(100/100)
Security Score100/100

About sprint-planning

Plans a sprint by scoping work, estimating capacity, setting goals, and drafting a sprint plan document. It is intended for kicking off a new sprint, sizing a backlog against team availability while accounting for PTO and meetings, deciding what is P0 versus stretch, and handling carryover from the previous sprint. It accepts a sprint name or date range as an argument.

The skill is designed to work in two tiers. Standalone, it always defines sprint goals and success criteria, estimates team capacity accounting for PTO and meetings, scopes and prioritizes backlog items, identifies dependencies and risks, and generates a sprint plan document. When tools are connected, it is supercharged: a project tracker can pull the backlog, create the sprint, and assign items; a calendar can account for PTO and meetings in capacity; and a chat tool can share the sprint plan with the team. To run, it asks for the team and availability, sprint length, prioritized backlog, any carryover from last sprint, and cross-team dependencies.

The output is a structured sprint plan in markdown that includes the sprint name, dates, team size, and a one-sentence sprint goal, followed by a capacity table (available days, allocation, and notes per person), a prioritized sprint backlog table (P0/P1/P2 items with estimates, owners, and dependencies), a planned-capacity-versus-load summary, a risks table, a Definition of Done checklist, and a key dates table. Practical tips reinforce the method: plan to 70-80% capacity to leave buffer for interrupts, hold to one clear sprint goal statable in a single sentence, identify stretch items to cut if work runs long, and carry over honestly by understanding why something did not ship before re-committing.

FAQ

What does this skill need from me to plan a sprint?

The team and their availability, the sprint length, the prioritized backlog, any carryover from last sprint, and any cross-team dependencies. It accepts a sprint name or date range as an argument.

Does it require connected tools to work?

No. It works standalone to define goals, estimate capacity, scope and prioritize the backlog, identify risks, and generate the plan. Connecting a project tracker, calendar, and chat tool supercharges it with backlog pulls, PTO-aware capacity, and team sharing.

How much of the team's capacity should be planned?

The tips recommend planning to 70-80% capacity to leave buffer, since interrupts are expected. Stretch items should be identified so they can be cut if work runs long.

What does the generated sprint plan include?

A sprint goal, dates and team size, a capacity table, a prioritized backlog (P0/P1/P2 with estimates, owners, and dependencies), a planned-capacity-versus-load summary, a risks table, a Definition of Done checklist, and a key dates table.

How should carryover from the previous sprint be handled?

Honestly — the tips advise understanding why something did not ship before re-committing to it in the new sprint.

Install sprint-planning

Download and extract the skill files to your .claude/skills/ directory.

Quick Setup:

  1. Copy the skill folder to .claude/skills/
  2. Claude will automatically detect and use the skill